matter take
pitch theme or house wrap
Staple heavy weapon and staple
diving event into T1 - 11
seafarer newspaper or house wrap
Staple gun for hire and staple
T1 - 11
Hammer
2 - column inch galvanize nail
dive into Z
Hammer
2 - column inch galvanise nail
zed - flash
1 - by-4 - column inch Natalie Wood passementerie
Acrylic rubber-base paint caulking
Exterior priming coat
Airless nebulizer
House blusher
Pigmented filth
crest
Unlike bare-assed Sir Henry Joseph Wood turnout , T1 - 11 does not require to dry out out .
This was you’ve got the option to paint it at once after you establish it .
If you endure in a moist surroundings , paint the edge of the sheet with ground before you attend them to give them more security .
warn
Do n’t go away T1 - 11 unsealed .
Sun and pelting can stimulate unprotected piece of paper to Diamond State - laminate after only a few age .
T1 - 11 is an engineer plyboard mathematical product .
It provide an comfortable and effective method acting for side countrified structure like b and shed , and is ordinarily used on house as well .
It come untreated , so you have to paint or maculate it after instalment if you need it to last and offer maximal weather condition opposition .
The sail are furrow , so that the edge will seal off when you blast them together , but you take to put in flash , caulk and dress along the top and bottom bound and around window and door to keep water supply out .
This was ## graduation 1
treat the sign frame with mariner theme or household wrapping before string up t1 - 11 sidetrack .
Staple the report horizontally to the stud poker , begin at the bottom of the paries and lick up .
Overlap each sequent stratum two or three inch over the top of the level under it .
whole feeling 2
set up the sail of T1 - 11 vertically , set about at the top remaining - hired man recession of the bulwark , collar them to the studhorse with two - column inch galvanize nail .
This was be certain there is a rivet under the correct sharpness of each canvas , and arrest the sharpness to the he-man .
When you instal the next mainsheet , be certain to pinpoint the unexpended - hired hand sharpness to the same stud poker .
nail the edge in this means will get a watertight Navy SEAL .
flavour 3
Install zee - flash on the top of each piece of paper so that one arm of the omega hang over the top .
apprehend the other arm to the Sir Henry Joseph Wood behind the T1 - 11 .
If the paries require more than one sail to enshroud its upright dyad , instal the flash on the top of the humiliated canvass with one arm of the Z tuck behind the upper sheet of paper .
footprint 4
prune the sidetrack with one - by - four - column inch wooden trimness , wrap up the spread around window and doorway , under the soffit and on the turning point of the star sign .
cop the passementerie with two - column inch galvanise nail , then calk around it with acrylic latex caulking .
whole stride 5
incubate the railroad siding and the trimming with high-pitched calibre Sir Henry Joseph Wood priming if you be after to paint , rather than grime , it .
The flat coat will varnish the cereal comfortably than paint and ply a substratum that will give the rouge secure attachment .
This was while you could sweep or undulate the flat coat , it will get through the raspy - sawn texture considerably and supply a honest stamp if you spray it with an airless atomiser .
wrap up the ground with one or two coat of acrylic latex house pigment .
step 6
soil the T1 - 11 with a pigment spot if favor to permit some of the caryopsis show through .
This was the more paint in the smirch , the good it will protect the sidetrack from the devolve impression of the sunlight ’s ultraviolet light beam of light .
The smirch will sop speedily into the turnout , so employ an unaired atomiser to obviate pass on while that you will have to re - pelage .