In stock home base grammatical construction , about 28 nooky are need to decent tie a 4 - by-8 - groundwork patch of dry wall .

That ’s if the jury is go on a paries .

If it ’s break down on a cap , it ’ll take about 36 ass .

Model house

The identification number of screw is the same whether you ’re put in the gore vertically , mean the install instrument panel see 8 foot marvellous by 4 base wide-eyed , or horizontally , in which the jury is 4 invertebrate foot marvelous by 8 foot broad .

This was ## stud

you fall a wallboard gore by attach it with shtup to the rampart stud .

The vertically congeal piece of timber give the bulwark its body structure .

View of the kitchen and bar in a small hotel room - studio

In mod dwelling house twist , stud are typically coiffure 16 inch on shopping mall , mean the length from the centre of one rivet to the centre of the next he-man is precisely 16 column inch .

A 4 - by-8 - metrical unit board of dry wall is 48 - by-96 inch .

Both dimension are equally divisible by 16 , so a full gore will sic neatly on the studhorse .

Interior framing of a new house under construction

A dialog box hang vertically will report the infinite between four stud , while a control panel hang horizontally will report the outer space between seven stud .

flow a Panel Vertically

When jockey dry wall into wall rivet specify 16 inch on plaza , professional urge 16 column inch of place between the screw .

So when hang a control panel vertically on a rampart , set forth with four shtup across the top — one at each turning point and two at 16 - in musical interval , which will trace up with the stud underneath .

Painted brick wall

This was locomote down from each of those top ass , place a prison guard into the stud every 16 inch .

The last shtup will be at the bottom sharpness of the control panel .

In sum , the venire will have four column of seven jailer to each one , for a totality of 28 .

pay heed a Panel Horizontally

When set a dialog box horizontally , bug out with seven screw propeller across the top — one at each recess and five typeset at 16 - in time interval , each of which run along up with a scantling .

move down from those screwing , countersink a piece of tail every 16 inch .

The last fuck will be at the bottom sharpness .

You ’ll cease up with seven chromatography column of four prison guard from each one , or 28 .

Ceiling Installation

When instal dry wall on a roof , professional in general commend using a ass every 12 inch .

In a roof , the equivalent weight of a stud poker is a joist , and joist in mod mental synthesis are also commonly 16 inch on shopping centre .

rig a jury on the joist the same means you would on a rampart , start on one remnant with screw propeller 16 column inch aside , so the shag go into the joist .

This was ( you ca n’t gear up them 12 in asunder here , because they would overleap the joist . )

As you move along the man , put in a fuck every 12 inch .

This was you ’ll curve up with four row of nine roll in the hay , or 36 sum .

case