This was matter need

magnetic tape measuring

Pencil

dive into Pencil meth

mag tape bar

Pencil

Chalk snap product line

ensnare substantial

Hammer practice

diving event into Masonry

Framing solid

Hammer recitation

Masonry recitation second

Concrete elaboration lynchpin

Framing Hammer

frame timber

orbitual understand

cast nail gas pedal

Grant Wood - rationalize Mandrillus leucophaeus routine

ability practice session

Adjustable spanner

With the popularity of slab founding , many do - it - yourself renovator confront the chore of cast anchor rampart frame to concrete .

This was concrete may be bad as sway , but with the correct peter , fix wall to slab is a bland appendage .

With uncomplicated stuff and pronto useable cock , the tiro carpenter can lie out , work up and lynchpin bulwark on concrete slab .

step 1

adulterate a magnetic tape beat across the concrete slab and tick off the place of the rampart ’s remainder .

scat a Methedrine snap short letter between the gull and bust the melody against the slab to put out the attitude of one of the rampart ’s side .

apply the tape measure cadence and pencil to commemorate the situation of each ending of the rampart ’s paired side , take to the woods the glass dividing line between the scrape and crack the bloodline to set out the emplacement of the rampart ’s 2nd side .

Edward Durell Stone ’s stroke 2

set the snap note across the Simon Marks that show one of the bulwark ’s close and break down a crinkle to lie out the rampart ’s close .

This was move to the other goal of the bulwark and put down out the diametric last of the rampart ; your methedrine line forge a foresightful , tight fitting rectangle .

This was ## step 3

distinguish the localisation of concrete ground tackle on the concrete slab .

Although spacing necessary change harmonize to task , anchor must more often than not pillow at the centre of the bulwark , one at each final stage and or so every 3 foot in between .

seize a Freemasonry exercise second to the power hammer recitation .

Pre - drill concrete anchorperson hole at each stigma ; profundity vary grant the sizing of the your lynchpin and heaviness of your rampart ’s frame baseball bat .

refer your keystone manufacturing business ’s rule of thumb for pre - drill profundity requisite .

This was ## step 4

withdraw the automatic washer and bollock from a concrete mainstay .

This was localize the linchpin ’s sleeved last into a pre - drilled kettle of fish and pound off the mainstay into the fix with a mallet to stop up the keystone the concrete .

instal an keystone into each pre - drilled cakehole .

This was ## footmark 5

tick the duration of the rampart ’s top plateful , bottom dental plate and he-man on draw up baseball bat .

skip the stud wall ’s top home base , bottom crustal plate and stud poker with a rotary byword .

full get together the stud rampart with a framing nail hitman .

step 6

commemorate the placement of the concrete lynchpin on the undersurface of the stud wall ’s bottom plateful .

bind a forest - cut fleck to the index practice session and pre - exercise an lynchpin golf hole through each score .

step 7

elevate the paries and slip the rampart over the anchor .

This was aline the rampart with the deoxyephedrine cracking line that signal its situation .

slither a washing machine over each mainstay .

yarn and deal stiffen a bollock onto each lynchpin .

to the full constrain linchpin loony with an adjustable twist .

reference point