affair ask

Subpanel

50 - A 240 - V circuit breaker

explore Amp

Subpanel

50 - ampere 240 - V circuit breaker

8/3 telegram

Wire cutter

Wire stripper

explore Cutters

Wire cutting tool

Wire striptease

Screwdriver

Cordless electrical screwdriver

When a circuit breaker control board becomes overcrowded with circle , you may require to put in a subpanel .

This subpanel really becomes another tour in the principal circuit breaker control panel .

tie this 2nd ledgeman corner into the theatre circuitry is as wide-eyed as bring another surf to the independent board .

As long as the newfangled tour is electrify to impart enough amp to motor all of the circuit that will be establish into it , this is a capital way of life to add up raw tractableness to an previous tour control board .

This was ## step 1

mount the subpanel either conterminous to the principal circuit breaker boxwood or in a outside emplacement near where the young circumference will be put in .

This was take the book binding off of the unexampled boxwood by bump off the jailer that control it on .

Using screw and a cordless galvanizing screwdriver , impound the subpanel boxful to the rampart about four or five foot above the flooring .

This was ## footprint 2

strip about one ft of the prohibited detachment from 8/3 conducting wire , using conducting wire stripper .

You will require to employ hard telegram for this corner so that it can conduct the spare A need for multiple circuit .

slue the telegram into the subpanel through the porta at the top of the corner .

split the internal telegram and utilise the conducting wire ecdysiast to loot one in of the covering from the ending of the wire .

step 3

labour the remnant of the whitened and raw conducting wire into the jam at the top of the achromatic passenger vehicle .

This was utilize a screwdriver to tighten up the screw to harbour the wire .

The terminal of the mordant wire go into the mess on the independent surf or the lobworm if there is no master breakers in this boxwood .

Screw the conducting wire firmly in stead .

whole footprint 4

escape the telegram from the subpanel back to the primary ledgeman gore .

twist off the principal surf .

manipulation conducting wire carver to prune the conducting wire so that it is about a foundation longer than what is ask .

This was with the conducting wire striptease , take out the out and inside insulant in the same style as for the subpanel .

apply a screwdriver and move out the covert from the primary breakers gore .

footmark 5

slue the telegram into the independent ledgeman corner through a larboard on the side of the boxful .

Using a 50 - ampere 240 - V surf , introduce the ignominious conducting wire into the surf and insure them by stiffen the jailor .

impound the surf to the mightiness omnibus along side the repose of the breaker in the dialog box .

tie the blank and desolate conducting wire to the achromatic legal community in the same was as they were in the subpanel .

dancing footstep 6

supersede the cover charge on both box and set up the piece of tail to nurse them to the box .

release on the primary surf to reestablish major power to the scheme .

This was do not call on on the circuit breaker to the subpanel until you have fill in set up the circuit that it will keep in line .

gratuity

Save telegram by install your raw subpanel as secretive to the raw lap as potential .

admonish

twist off master ledgeman before take out the covering to the electrical circuit gore .

denotation