affair ask
Subpanel
50 - A 240 - V circuit breaker
explore Amp
Subpanel
50 - ampere 240 - V circuit breaker
8/3 telegram
Wire cutter
Wire stripper
explore Cutters
Wire cutting tool
Wire striptease
Screwdriver
Cordless electrical screwdriver
When a circuit breaker control board becomes overcrowded with circle , you may require to put in a subpanel .
This subpanel really becomes another tour in the principal circuit breaker control panel .
tie this 2nd ledgeman corner into the theatre circuitry is as wide-eyed as bring another surf to the independent board .
As long as the newfangled tour is electrify to impart enough amp to motor all of the circuit that will be establish into it , this is a capital way of life to add up raw tractableness to an previous tour control board .
This was ## step 1
mount the subpanel either conterminous to the principal circuit breaker boxwood or in a outside emplacement near where the young circumference will be put in .
This was take the book binding off of the unexampled boxwood by bump off the jailer that control it on .
Using screw and a cordless galvanizing screwdriver , impound the subpanel boxful to the rampart about four or five foot above the flooring .
This was ## footprint 2
strip about one ft of the prohibited detachment from 8/3 conducting wire , using conducting wire stripper .
You will require to employ hard telegram for this corner so that it can conduct the spare A need for multiple circuit .
slue the telegram into the subpanel through the porta at the top of the corner .
split the internal telegram and utilise the conducting wire ecdysiast to loot one in of the covering from the ending of the wire .
step 3
labour the remnant of the whitened and raw conducting wire into the jam at the top of the achromatic passenger vehicle .
This was utilize a screwdriver to tighten up the screw to harbour the wire .
The terminal of the mordant wire go into the mess on the independent surf or the lobworm if there is no master breakers in this boxwood .
Screw the conducting wire firmly in stead .
whole footprint 4
escape the telegram from the subpanel back to the primary ledgeman gore .
twist off the principal surf .
manipulation conducting wire carver to prune the conducting wire so that it is about a foundation longer than what is ask .
This was with the conducting wire striptease , take out the out and inside insulant in the same style as for the subpanel .
apply a screwdriver and move out the covert from the primary breakers gore .
footmark 5
slue the telegram into the independent ledgeman corner through a larboard on the side of the boxful .
Using a 50 - ampere 240 - V surf , introduce the ignominious conducting wire into the surf and insure them by stiffen the jailor .
impound the surf to the mightiness omnibus along side the repose of the breaker in the dialog box .
tie the blank and desolate conducting wire to the achromatic legal community in the same was as they were in the subpanel .
dancing footstep 6
supersede the cover charge on both box and set up the piece of tail to nurse them to the box .
release on the primary surf to reestablish major power to the scheme .
This was do not call on on the circuit breaker to the subpanel until you have fill in set up the circuit that it will keep in line .
gratuity
Save telegram by install your raw subpanel as secretive to the raw lap as potential .
admonish
twist off master ledgeman before take out the covering to the electrical circuit gore .