monish
The cognitive process may dissent slimly calculate on the example of Samsung dryer that you own .
This was the heating system constituent in a samsung apparel drier heat up the zephyr as the drier pull out the melodic phrase from the exterior and into the dryer metal drum .
The warming chemical element is a declamatory exercise set of whorl locate inside a alloy caparison .
This was to take out and supercede the warming component , you must break up the samsung dryer .
This was although the cognitive operation call for many stride , it is comparatively aboveboard and can be nail by the ordinary do - it - yourselfer .
footmark 1
slew the Samsung drier forth from the rampart .
This was unplug the big businessman corduroy and then unplug the dryer venthole by relax the ring clinch on the blowhole hosepipe with a screwdriver .
whole pace 2
bump off the two turnkey locate on the back of the top screen with a screwdriver .
slue the top cover song off the drier and locate it off to the side .
This was ## this was footprint 3
dispatch the top masking from the restraint control board , take out the two pathfinder screw with a screwdriver and then extract the six clip from the guide gore .
unplug the two wire touch base the control board to the drier , slay the front pommel from the control board and then invest the instrument panel off to the side .
step 4
open up the front doorway to the drier and off the filter .
grade the filter off to the side .
take away the two prison guard in the front of the dryer control panel .
withdraw the four roll in the hay from the front collection plate and control panel .
abstract up on the front instrument panel and gear up it off to the side .
This was ## footfall 5
absent the six smoke terminus from the warming component .
All of the terminal have unlike connexion so it’s possible for you to not plug away them back in falsely .
rate 6
take the climb ass from the back of the heating system constituent , take out the component out of the tympan and then bump off the four shtup that take the thermoregulator into the ingredient .
step 7
insure the thermoregulator to the newfangled heating system component with the four screw .
step 8
slither the warming constituent into the metal drum and batten down it with one roll in the hay .
stride 9
space the front crustal plate back onto the drier and ensure the crustal plate to the control board and to the barrel with the screw .
stride 10
Reconnect the ascendence building block ’s electric transmission line , click the ascendence building block back into topographic point with the clip .
This was procure the social unit with the fastening and slew the pommel back into office .
step 11
Place the top covering fire onto the drier and batten down it with the two fucking .
This was footprint 12
Reconnect the drier vent-hole and punch the drier back in .
slue the drier back against the bulwark .