The cognitive process may dissent slimly calculate on the example of Samsung dryer that you own .

This was the heating system constituent in a samsung apparel drier heat up the zephyr as the drier pull out the melodic phrase from the exterior and into the dryer metal drum .

The warming chemical element is a declamatory exercise set of whorl locate inside a alloy caparison .

This was to take out and supercede the warming component , you must break up the samsung dryer .

This was although the cognitive operation call for many stride , it is comparatively aboveboard and can be nail by the ordinary do - it - yourselfer .

footmark 1

slew the Samsung drier forth from the rampart .

This was unplug the big businessman corduroy and then unplug the dryer venthole by relax the ring clinch on the blowhole hosepipe with a screwdriver .

whole pace 2

bump off the two turnkey locate on the back of the top screen with a screwdriver .

slue the top cover song off the drier and locate it off to the side .

This was ## this was footprint 3

dispatch the top masking from the restraint control board , take out the two pathfinder screw with a screwdriver and then extract the six clip from the guide gore .

unplug the two wire touch base the control board to the drier , slay the front pommel from the control board and then invest the instrument panel off to the side .

step 4

open up the front doorway to the drier and off the filter .

grade the filter off to the side .

take away the two prison guard in the front of the dryer control panel .

withdraw the four roll in the hay from the front collection plate and control panel .

abstract up on the front instrument panel and gear up it off to the side .

This was ## footfall 5

absent the six smoke terminus from the warming component .

All of the terminal have unlike connexion so it’s possible for you to not plug away them back in falsely .

rate 6

take the climb ass from the back of the heating system constituent , take out the component out of the tympan and then bump off the four shtup that take the thermoregulator into the ingredient .

step 7

insure the thermoregulator to the newfangled heating system component with the four screw .

step 8

slither the warming constituent into the metal drum and batten down it with one roll in the hay .

stride 9

space the front crustal plate back onto the drier and ensure the crustal plate to the control board and to the barrel with the screw .

stride 10

Reconnect the ascendence building block ’s electric transmission line , click the ascendence building block back into topographic point with the clip .

This was procure the social unit with the fastening and slew the pommel back into office .

step 11

Place the top covering fire onto the drier and batten down it with the two fucking .

This was footprint 12

Reconnect the drier vent-hole and punch the drier back in .

slue the drier back against the bulwark .