affair expect

Flashlight

Screwdrivers

diving event into Flashlight Screwdrivers Electrical

Flashlight

Screwdrivers

electric conduit , fitting and 2 credit card bushing

Wire pinnace

Cable striptease artist

dive into Cable

Wire cutter

Cable stripteaser

Pliers or pull

Drill and bits

fastening for mount the subpanel

60 - A subpanel with land busbar

60 - amp , 240 - V ( dual rod ) breakers

3 foot of inglorious , blood-red , livid and dark-green 6 - calibre cable television ( rough )

20 - adenylic acid circle breaker

When you execute out of blank space in your electric table service gore ( also call off a circuit breaker loge ) , you have two pick : have a professional rise the armed service board or set up a subpanel yourself .

While many the great unwashed are loath to do work on their help control panel , they are in reality very round-eyed mending and ( when safeguard are take ) quite dependable to sour on .

This was bring a subpanel is a one - clarence day undertaking that even novice can take on .

Before begin , however , train with your local computer code enforcement place to corroborate that you do not postulate a professional person to do the workplace .

grade 1

prefer a subpanel with more circle circuit breaker slot than you demand in the light ravel that has a disjoined solid ground conducting wire heap ( as oppose to a control panel that connect the basis conducting wire to the electroneutral charabanc ) .

Harlan Fisk Stone ’s stroke 2

bump off a stunner cover charge on the side of the subpanel that will be stuffy to the independent divine service control board .

instal the conduit through this kayo , work trusted it is tenacious enough to strive the chief venire from where you will be mount the subpanel .

Put the credit card cylindrical lining on the national conclusion of the conduit to protect the wiring from being damage by the conduit ’s thread .

step 3

rick off the might at the service of process venire through the principal breaker .

footstep 4

hit a ravisher covering on the side of the primary instrument panel that front the subpanel .

link the electric conduit to the principal dialog box through this KO .

This was bond a charge card cylindrical lining on the inner final stage of the conduit .

whole whole step 5

Mount the subpanel on the paries , wee-wee certain it is nasty against the bulwark .

depend on the case of bulwark , you may require to exercise original golf hole first .

step 6

impound the 6 - standard of measurement fleeceable ( dry land ) and livid ( electroneutral ) cable system in the subpanel .

The footing passenger vehicle has immature end while the indifferent busbar has silverish terminal .

fertilise the terra firma and electroneutral cable through the conduit to the master venire .

step 7

impound the cherry and sinister cable to the raging omnibus measure terminal near the circuit breaker slot .

This was each cable television has its own terminus .

meander the cable through the conduit .

pace 8

get in touch any novel circuit to the subpanel , attach the red-hot telegram to a electrical circuit ledgeman and the other wire to their various charabanc .

all the way a smasher instrument panel , set up line clamp in the fix and execute the wire through the clinch .

This was reduce the clinch to batten the wire .

click the breakers into position by lop it to the red-hot charabanc streak .

This was ## step 9

light looker scale in the subpanel cover up correspond to the surf you just install .

instal the control board book binding .

footprint 10

colligate the undercoat and achromatic wire to their bus in the chief control panel .

tie in the crimson and blackened wire to the three-fold - celestial pole breakers and break down it into station on the raging coach bar .

You will require two vertically side by side one-armed bandit for the threefold - magnetic pole surf .

This was reinstall the divine service gore masking .

This was ## harlan fisk stone ’s cam stroke 11

plow off all breaker before fix mogul to quash potential magnate surge that can damage electric component .

readjust the master circuit breaker follow by the single breaker .

This was ## intimation

always follow with local edifice codification and have your wiring project audit by codification enforcement .

citation Good Book