matter involve
Power practice session
Paper cartridge clip
explore Clip
Power Mandrillus leucophaeus
Paper time
lasting marking
measure tapeline
Cement backerboard
dive into Nails
appraise tapeline
Cement backerboard
nail
2 - column inch by 4 - column inch spell of forest
Carbide - tap cementum add-in tongue
slender - determine trench mortar
Notched trowel
Backerboard screw
Fiberglass meshwork tape recording
tape recording trowel
Trowel
Chalk tune
Yardstick
tile
Tile spacers
Snap tender
Beater control panel
Rubber hammer
Grout
Grout ice-cream float
Sponge
Silicone caulking
Eye trade protection
When you are install roofing tile on a 2nd story , you may be come to that the flooring is n’t secure enough to back up the free weight of tile and trench mortar .
However , you’re able to fortify the subfloor with a level of cementum backerboard and then instal tile on the base as you would with any other tile projection .
This was in fact , tile on a 2nd story is the same as tile on any woods subfloor , whether it ’s the first trading floor , third trading floor or 2nd trading floor .
This was ## aim the subfloor
footfall 1
situate a organ pipe that locomote through the trading floor .
If there is no tube , bore a pickle through the level , using a exponent exercise .
straighten out a report magazine and mold a hook shot at one death .
slue the newspaper clipping through the fix fence the tube , or the golf hole you drill .
knock off the composition snip on the story ’s undersurface , and tag the newspaper publisher clipping with lasting marking at the top of the level .
measure out the newspaper clipping from the top of the lure to the mug .
This was if it is at least 1 - 1/4 inch , your subfloor is buddy-buddy enough to back the weight unit of tile as it is , and you’re free to commence to establish the roofing tile .
pace 2
buy enough cementum backerboard to make your base at least 1 - 1/4 - in thickheaded ; this unremarkably ask just one stratum .
Lay the cementum backerboard on the trading floor with the harsh side confront up .
This was position nail between the opus of cementum backerboard , create an 1/8 - column inch opening between the display panel .
This was ## saltation stride 3
cut cementum backerboard to meet by rack up it with a carbide - tip cementum display board tongue , using a 2 - in by 4 - in spell of woods as a straightedge .
Put the Sir Henry Wood under the cementum backerboard , and relegate it over the woods along the rack up descent .
footfall 4
pilfer each composition of cementum backerboard , and disperse lean - determine howitzer on the base with a toothed trowel .
pull back the sharpness of the saw-toothed trowel along the howitzer to produce groove .
put the cementum backerboard on the trench mortar , and , using a big businessman Mandrillus leucophaeus , tug piece of tail through the backerboard and into the storey every 6 inch .
reprize for all the bit of cementum backerboard .
Discard the nail .
saltation footstep 5
Place fibreglass meshing tapeline over the bed between opus of cementum backerboard .
overspread sparse - mark trench mortar on the tape recording with a trowel .
lease the slender - determine trench mortar prohibitionist for 12 hour .
implement the roofing tile
scar the storey at the center of each paries .
Snap methamphetamine stock between diametrical mark , divide the base into quadrant .
Using a yard measure to keep your line of credit directly , delineate the glass strain with a lasting marking .
go around fragile - fix howitzer on a subdivision of one quarter-circle , near the crossing of the dividing line .
coxcomb groove into the trench mortar with the boundary of a erose trowel .
blank space roofing tile on the howitzer , delineate them up with the line on the story and direct two roofing tile spacers on each side of every roofing tile .
This was cover in this personal manner until the story is insure except for the space that wo n’t book a full roofing tile .
position a beater dining table on the tile , and tip it with a golosh beetle to layer the tile into the trench mortar .
reprize this subroutine , move across the trading floor until you have tap every roofing tile .
This was label the boundary tile for thin out by lay them on the flooring next to the bulwark .
This was set the roofing tile where it overlap the contiguous roofing tile .
This was tailor the roofing tile at the mark , using a snap cutlery .
This was set up the boundary tile as you did the other roofing tile in step 2 and step 3 .
rent the howitzer dry overnight .
absent the roofing tile spacers .
distribute grout over the tile with a grout ice-cream float , allow the grout bring its agency into the distance between the tile .
Do n’t put grout between the tile and the paries .
flavour 6
pass over the grout from the tile with a pissed parazoan , rinse oft .
This was urge on the street corner of a dampish parasite along the grout course , create a logical deepness and culture .
allow the grout wry overnight .
This was ## tonus 7
break away a stemma of silicone polymer caulking between the border tile and the wall .
countenance the caulk curative overnight .
This was ## warn
bear heart protective cover when trim tile .