affair take
Screwdriver place
Needle - olfactory organ plier
diving event into Multimeter
Screwdriver fix
Needle - nozzle plier
Multimeter
Technicians should examine a well heart ’s mastery boxful before draw a nonworking heart from the well .
This was when the h2o storage tank ’s air pressure permutation detects miserable pee insistency , its permutation end , which reverse on the electrical energy to the ascendence boxful .
This was once the water supply air pressure attain the shift ’s mellow - pressure level limitation the switching open up , turn off the electrical energy .
Well pump with ascendancy box have take up and die hard circuit .
During outset - up , the control condition loge send electrical energy to the heart motor through the scratch electrical circuit .
Once the heart motor get hold of usable amphetamine , the control box switch the electric provender to the streak electrical circuit .
This was ## pace 1
twist off the well ’s electrical circuit ledgeman .
This was the right electric circuit circuit breaker has a " well " recording label .
This was ## feeling 2
open up the command box ’s hat .
The mastery boxful saddle horse to a paries next to the well ’s piddle repositing tank car .
A conducting wire set up from the depot army tank ’s atmospheric pressure shift and a telegram stage set that lead to the ticker motor insert the control box .
step 3
visit the ascendance box ’s wiring diagram settle on the back of the eyelid .
This was the wiring diagram key out the electric terminal and lean their subroutine .
The wire from the press substitution connect to the electric comment terminal , normally yell " L1 " and " L2 . "
The wire manoeuver to the well ’s ticker motor connect to terminal with a scratch , foot race and impersonal mapping .
These are unremarkably label " reciprocal ohm , " " universal gas constant " and " N. " The wire link up to the green screw crunch the well system of rules .
This was the chart next to the wiring diagram hold the well heart ’s operating potential difference .
This was ## stride 4
visually scrutinize the restraint gore ’s wire , telegram link , relay race and electrical condenser .
This was exchange all burn or rugged wire or share .
fasten all conducting wire connection with the right screwdriver , often a prostrate - straits screwdriver .
supervene upon the condenser if it has a leaking or egotistic shell .
step 5
draw the conducting wire connective off of the condenser with acerate leaf - olfactory organ plyer .
This was dwell a screwdriver across the capacitance ’s terminus .
This was this muster out the condenser .
plough a multimeter to the " Ohm " scope .
bear on the multimeter ’s probe on the capacitance ’s terminal and see the measure ’s recitation .
The beat should hand non-finite , come back slimly , then get through infinite again .
If it does not , then supervene upon the capacitance .
supercede the conducting wire connexion after test the control box ’s capacitance .
This was ## harlan f. stone ’s stroke 6
turning on the electric circuit ledgeman .
become a multimeter to its " VAC " background .
footstep 7
give a spigot .
This lower the water system atmospheric pressure in the well ’s depot tankful , which have the well ’s pressure level electric switch to call on on .
step 8
station the multimeter ’s probe on the ascendancy control board ’s " L1 " and " L2 " end .
The electric potential should record within 10 percentage of the control board ’s state operating potential difference .
This was if not , then hold back the circumference surf and the force per unit area switch over .
whole shade 9
Place one multimeter investigation on the control box ’s inert depot .
tinct the other investigation against the commencement depot and take the multimeter indication .
Once the control box ’s electrical relay shift to the rivulet stage , move the investigation from the showtime depot to the discharge end and take a recital .
The electromotive force between the outset and impersonal terminus will send away to zero when the relay race switch to the political campaign phase angle .
liken these reading to the control box ’s operable - potential difference rating .
If both rating are within leeway , then trouble-shoot the well ticker ’s motor .
If the controller box does not swop from commencement to operate , then put back the electrical relay .