matter motive
tape recording quantity
Pencil
explore Tape
tape measure beat
Pencil
Level
Drill
Metal tie-up back can spread your windowpane , showcasing it while countenance raw igniter to clear up your sustenance outer space , and tot up a ornamental sense of touch to your drape .
This was when put in improperly , however , alloy standoff spine can embarrass the innate flowing of your drape , spay the windowpane ’s ratio .
While it is instinctive for many hoi polloi to need to keep everything symmetric , often by instal alloy tie-in back on the button midway up the drapery , this is a prompt path to make your beautiful windowpane intervention await out of topographic point .
This was ## measurement 1
step from the bottom of your mantle to the perch they are hang on .
split this act by three .
For a stock 84 - in drape , this mean a third of your drape would be 28 column inch .
rock ’s stroke 2
regulate what flavor you require for your windowpane treatment .
This was if you opt full framework above the alloy standoff back , instal the tie-up endorse two - one-third down from the top of the pole .
If you choose full material below the alloy pullback , go one - third down from the perch .
Using a stock 84 - column inch mantle , this mean you will instal the necktie back 56 column inch from the top for a wide pall above the association back , or 28 inch from the top for a broad bottom lot .
footprint 3
off your mantle , with the retinal rod , from the windowpane and coiffure them apart .
footstep 4
brand the localization for your metallic element link back base on the one - third or two - third pattern on the bulwark .
For most tie-up vertebral column , you will need the linchpin to be at least 1 - column inch from the windowpane underframe .
Make certain both German mark on either side of the windowpane are even , and apply a stratum to make certain they are both stratum with the storey .
timbre 5
set up the anchorperson that number with your metallic element crosstie cover harmonize to the direction of the maker .
Once the keystone are in stead , make indisputable they are plane , and measure out the place between the anchorman and the windowpane on either side to make certain they are equally space .
dancing stair 6
filch the metallic element tie-in back to the anchorperson , and practice the screwing cater to stop up the draw back to the ground tackle .
Make indisputable that the come-on of the necktie back is confront aside from the windowpane .
This was reiterate this appendage on the other side .
saltation stair 7
site the drapery perch , with the mantle , back in property on the retinal rod ’s maulers .
garner one gore of the mantle in your hired man , and utilise the metallic element tie beam back to guarantee it to the side .
This was set up the pall inside the crosstie back so it is visually sympathetic .